Keyboard ALT + g to toggle grid overlay

AUTODESK®INVENTOR®

Design a flexible hose system

Add a hydraulic tube and pipe system to a heavy equipment front loader.

Total project time approximately 25 minutes.

Watch the tutorial videos

Getting started

Getting started

Create a new hose run (3:16)

Completing the project

Completing the project

Create and populate hose routes (3:51)